Carrathool Bridge Culvert and Retaining Wall Works

Client: Carrathool Shire Council

Head Contractor: McKeon Earthmoving

Extension of the 30m long, 9-cell culvert forming the Carrathool Bridge.

Addition of 45 pre-cast box culverts to widen the bridge from 5m out to 17.5m allowing for a wider road pavement to service increased traffic.

In-Situ construction of upstream and down stream aprons, wingwalls and headwalls.

Installation of two, 2.5m x 10m Reinforced concrete retaining wall with 7.5m wingwalls.